Turnkey Projects
JDS are able to offer a complete Turnkey service, We will strip out and dispose of the existing kitchen, carry out the necessary builders work, electrical & mechanical first fix as required, this will be completed to the JDS M & E services drawing, before applying the necessary hygienic finishes, Wall Cladding, Vinyl Non Slip Flooring and suspended ceilings systems.
The kitchen equipment is then installed, commissioned and staff training is carried out, prior to handing back to the client.
Hygienic Finishes
As part of our Turnkey package, we are able to supply and install Hygienic White Wall cladding, this hygienic finish is bonded to the wall in sheets and joined with H trims or can be fully welded. Non-slip flooring is coved up the wall to meet the wall cladding where the system is fully sealed. We also supply a ceiling grid system with Vinyl faced tiles to complete the full Hygienic package.
Need more Information?
If you need more information regarding any of the services that we offer then please do not hesitate to contact us >
Builders works
Electrical First Fix
Hygienic non-slip flooring
Hygienic wall cladding